Voyager School Fix up 2026
AOK Foundation is fixing up Voyager school. Mey Duldulao was leading on this project
When: March 7th 2024. 8am to 3pm
Where: Voyager Charter, 2428 Wilder Avenue. Honolulu, HI 96822
AOKers, and Voyager staff and parents (students welcome to help if accompanied by parents)
Beautify and maintain campus together 🌱
Pictures from the project:
People Who Helped
Mey, Jordan (12 yr) D., Oliver (10yr) K. - Project lead, coordinate volunteer work and check in, liability waiver and event flow, put drinks in fridges, snacks and food prep in room 202
Evan K. - Coordinate project work, bring tools and supplies, fix tree fencing, fix roof next to playground
Keone M. - 8am to 1pm - Lunch coordinator, paint stairwell
Jenny, Alex (14 yr) K. - Stairwell painting
Elise, Brandon P. - school grounds coordinator, gardening coordinator
Krizia, Chris Baldon, Noah (6yrs), Nathaniel (2 yrs) - 8am to 10:30am - gardening
Jess (15 yrs), Dad - paint stairwell
Ken W. - paint stairwell
Jason L. - reattach net to suspension cable on roof, ceiling tiles, painting stairwell???
Reuben, Naila (11 yr), Nolan (7 yr) H. - 8am to 10:30am - photography, paint hop scotch
Angie, Mialani (13 yr), Makanalani (11 yr) S. - 10am to 3pm - Angie will paint stairwell, Mialani and Makanalani will do Play ground monitor, food prep
Jesse, Sophie (9 yr), Stella (11 yr) R. - 8am to 3pm - painting downstairs bathroom
Kawe , Mountain (11 yr) H. - Replace Sconces, Install Motion Detector Lights, Install a plumbing hatch to cover pipes, Cut the tree branches by the Basketball Court and front yard
Kim from Waialae School + 3 kids - 11am Lunch clean up, gardening, monitor Playground
Cole L - painting stairwell
Kaylee & Jamaal - painting lines on basketball court and four squares, painting stairwell (bringing extension laddres, extension poles, brushes, drop cloths, painting naps and rollers, power tools)
Mari, Aleck, Jigen (13 yr), Mugen (11 yr) - photography, gardening, tree trimming
Tak - ??? paint stairwell, ceiling tiles
Zoltan - ??? paint stairwell
Joey - maybe later, paint stairwell
Trung + 2 kids (below 14 yrs) - photography, paint benches, Ceiling tiles, gardening
Job List
Blacktop: Repaint basketball court lines both courts
Four Square Courts: Paint two full four-square courts
Ewa Stairwell: Paint all walls white on top (with darker color on the bottom to be painted a different day), leaving the large mural on the landing untouched
Stairwell Rails (To Be Painted a Different Day): Paint all handrails with blue paint in both stairwells for a fresh, clean look
1st Floor Walkway: Paint Hop Scotch
Paint Benches
Fix Chain Link Fence: Narrow the gap in the playground chain link fence door so that kids and balls can’t get through
Fix fencing around tree
Fix Roof of Sun Roof: Fix the roof panel that is bent out of shape in the front yard
1st Floor Bathroom: Paint the bathroom and clean with bleach and do anything else to reduce the smell
Put a plumbing hatch over hole in drywall
Ceiling Tiles: Replace damaged or stained ceiling tiles throughout the building as needed.
Outdoor Motion Detectors: Replace any broken or non-functioning units and install one in the parking garage area.
Install motion detector to light up the inside wall of the parking garage
Install motion detector to light up the inside wall of the parking garage
Lanai Sconces: Replace light bulbs and ensure all sconces are fully functioning, Replace broken sconces with new ones
Trim Branch by Tennis Court
Attach the net to the suspension cable
Attach the net to the suspension cable
Fix the leaking pipes: replace pipe clamps as needed
Garden Beds: Clean the garden beds and weed the areas in the front of the school
Front of Building: Trim the large tree at the front entrance to improve safety and appearance
Materials List
Elise / Voyager
Ceiling Tiles
Mey
Liability Forms
Pens
Evan
Swiss Coffee 15 gallons (white paint)
Grey Drylock paint 6 Gallons
Blue Metal paint - for railings
5 Motion detectors
10 on wall lights
10 bulbs if needed
Paint supplies
Yellow paint
Bring Random Color paints you have for art work
14 inch plumbing hatch