Voyager School Fix up 2026
What: AOK Foundation is fixing up Voyager school. Mey Duldulao is leading the project
When: March 7th 2024. 8am to 3pm
Where: Voyager Charter
Who: AOKers, and Voyager staff and parents (students welcome to help if accompanied by parents)
Goal: Beautify and maintain campus together 🌱
Who is Coming So Far
Evan, Jenny, Alex (14 yr), Oliver (10 yr) K.
Mey, Jomel, Jordan (12 yr) D.
Krizia, Chris Baldon, Noah (6yrs), Nathaniel (2 yrs) - 8am to 10:30am - gardening
Roy
Elise, Brandon P.
Ivan, Stevan (11 yr), Martin (9 yr?) K. ?
Reuben, Naila (11 yr), Nolan (7 yr) H. - Voyager Coach
Angie, Mialani (13 yr), Makanalani (11 yr) S. - 8am to 3pm - Angie will paint, Mialani and Makanalani will do Play ground monitor and food prep
Sarita, Sophie (9 yr), Stella (11 yr) R. - 8am to 3pm - designing and painting the front stairs
Kawe , Mountain (11 yr) H. ?
Kim from Waialae School + 3 kids
Job List
Blacktop: Repaint basketball court lines both courts
Four Square Courts: Paint two full four-square courts
Ewa Stairwell: Paint all walls white on top (with darker color on the bottom to be painted a different day), leaving the large mural on the landing untouched
Stairwell Rails (To Be Painted a Different Day): Paint all handrails with blue paint in both stairwells for a fresh, clean look
1st Floor Walkway: Paint Hop Scotch
1st Floor Bathroom: Paint the bathroom and clean with bleach and do anything else to reduce the smell
Put a plumbing hatch over hole in drywall
Ceiling Tiles: Replace damaged or stained ceiling tiles throughout the building as needed.
Outdoor Motion Detectors: Replace any broken or non-functioning units and install one in the parking garage area.
Install motion detector to light up the inside wall of the parking garage
Lanai Sconces: Replace light bulbs and ensure all sconces are fully functioning, Replace broken sconces with new ones
Trim the branch by the basketball court
Attach the net to the suspension cable
Fix the leaking pipes by replacing pipe clamps as needed
Garden Beds: Clean the garden beds and weed the areas in the front of the school
Front of Building: Trim the large tree at the front entrance to improve safety and appearance
Paint Front Stairs: Paint a welcome message or picture on the front stairs
Materials List
Elise / Voyager
Ceiling Tiles
Mey
Liability Forms
Pens
Evan
Swiss Coffee 15 gallons (white paint)
Grey Drylock paint 6 Gallons
Blue Metal paint - for railings
5 Motion detectors
10 on wall lights
10 bulbs if needed
Paint supplies
Yellow paint
Bring Random Color paints you have for art work
14 inch plumbing hatch