Voyager School Fix up 2026

What: AOK Foundation is fixing up Voyager school. Mey Duldulao is leading the project

When: March 7th 2024. 8am to 3pm

Where: Voyager Charter

Who: AOKers, and Voyager staff and parents (students welcome to help if accompanied by parents)

Goal: Beautify and maintain campus together 🌱

Who Came 2024

Evan, Jenny, Alex (12 yr), Oliver (8 yr) K.

Mey, Jomel, Jordan (10 yr) D.

Keone M.

Travis M.

Kenny M.

Gabe C.

Rob M.

Dennis L.

Ken W.

Tak M.

Tony T.

Alex L.

Aaron M.

Leighton M.

Harvey C.

Dean K.

Jones H.

Warren O.

Elise, Brandon P.

Eduord, Sasha (8 yr) P.

Ivan, Stevan (9 yr), Martin (7 yr?) K.

Ani, Ginger (10 yr) B.

Reuben, Naila (9 yr), Nolan (5 yr) H. - Voyager Coach

Angie, Mialani (10 yr), Makanalani (9 yr) S. (8:30am - 1pm)

Mandi, Jeriah (12 yr), Tevyn (9 yr) C. (10am - 2pm)

Sarita, Sophie (7 yr), Stella (9 yr) R. (12:30 - 2pm)

Rowel Guinoo, Peyton (7 yr) G. (noon - 2pm)

Kawe , Mountain (9 yr) H.

Will, Hinckley (7 yr) F. (10am - noon)


Job List

  • Blacktop: Repaint basketball court lines both courts

  • Four Square Courts: Paint two full four-square courts

  • Ewa Stairwell: Paint all walls white on top (with darker color on the bottom to be painted a different day), leaving the large mural on the landing untouched

  • Stairwell Rails (To Be Painted a Different Day): Paint all handrails with blue paint in both stairwells for a fresh, clean look

  • 1st Floor Walkway: Paint Hop Scotch

  • 1st Floor Bathroom: Paint the bathroom and clean with bleach and do anything else to reduce the smell

  • Ceiling Tiles: Replace damaged or stained ceiling tiles throughout the building as needed.

  • Outdoor Motion Detectors: Replace any broken or non-functioning units and install one in the parking garage area.

Install motion detector to light up the inside wall of the parking garage

  • Lanai Sconces: Replace light bulbs and ensure all sconces are fully functioning, Replace broken sconces with new ones

  • Fix the leaking pipes by replacing pipe clamps as needed

  • Garden Beds: Clean the garden beds and weed the areas in the front of the school

  • Front of Building: Trim the large tree at the front entrance to improve safety and appearance

Materials List

Home Depot material List

Mey

  • Liability Forms

  • Pens