Voyager School Fix up 2026

What: AOK Foundation is fixing up Voyager school. Mey Duldulao is leading the project

When: March 7th 2024. 8am to 3pm

Where: Voyager Charter

Who: AOKers, and Voyager staff and parents (students welcome to help if accompanied by parents)

Goal: Beautify and maintain campus together 🌱

Who is Coming So Far

Evan, Jenny, Alex (14 yr), Oliver (10 yr) K.

Mey, Jomel, Jordan (12 yr) D.

Krizia, Chris Baldon, Noah (6yrs), Nathaniel (2 yrs) - 8am to 10:30am - gardening

Roy

Elise, Brandon P.

Ivan, Stevan (11 yr), Martin (9 yr?) K. ?

Reuben, Naila (11 yr), Nolan (7 yr) H. - Voyager Coach

Angie, Mialani (13 yr), Makanalani (11 yr) S. - 8am to 3pm - Angie will paint, Mialani and Makanalani will do Play ground monitor and food prep

Sarita, Sophie (9 yr), Stella (11 yr) R. - 8am to 3pm - designing and painting the front stairs

Kawe , Mountain (11 yr) H. ?

Kim from Waialae School + 3 kids


Job List

  • Blacktop: Repaint basketball court lines both courts

  • Four Square Courts: Paint two full four-square courts

  • Ewa Stairwell: Paint all walls white on top (with darker color on the bottom to be painted a different day), leaving the large mural on the landing untouched

  • Stairwell Rails (To Be Painted a Different Day): Paint all handrails with blue paint in both stairwells for a fresh, clean look

  • 1st Floor Walkway: Paint Hop Scotch

  • 1st Floor Bathroom: Paint the bathroom and clean with bleach and do anything else to reduce the smell

  • Put a plumbing hatch over hole in drywall

  • Ceiling Tiles: Replace damaged or stained ceiling tiles throughout the building as needed.

  • Outdoor Motion Detectors: Replace any broken or non-functioning units and install one in the parking garage area.

Install motion detector to light up the inside wall of the parking garage

  • Lanai Sconces: Replace light bulbs and ensure all sconces are fully functioning, Replace broken sconces with new ones

Trim the branch by the basketball court

Attach the net to the suspension cable

  • Fix the leaking pipes by replacing pipe clamps as needed

  • Garden Beds: Clean the garden beds and weed the areas in the front of the school

  • Front of Building: Trim the large tree at the front entrance to improve safety and appearance

Paint Front Stairs: Paint a welcome message or picture on the front stairs

Materials List

Elise / Voyager

  • Ceiling Tiles

Mey

  • Liability Forms

  • Pens

Evan

  • Swiss Coffee 15 gallons (white paint)

  • Grey Drylock paint 6 Gallons

  • Blue Metal paint - for railings

  • 5 Motion detectors

  • 10 on wall lights

  • 10 bulbs if needed

  • Paint supplies

  • Yellow paint

  • Bring Random Color paints you have for art work

  • 14 inch plumbing hatch