WHAT WE HAVE DONE SO FAR:

  • Sealed the roof of building 4 & 1

  • rebuild the frames of and install 8 new screen doors

  • Started caulking and foam spraying the CMT blocks that are cracking

  • Repaired the screens in building 4 & 1

  • replaced the fire extinguishers

  • replaced the broken / missing louvers in building 4

  • Organized building 4

  • Organized and cleaned out the workshop

  • Inventoried the entire camp

  • Inventoried all paints

  • Sorted out what needs to be thrown away

  • Cut path to the look out

  • Figured out how the water intake system works

  • New signs for each building

  • Paint over graffiti

  • Start landscaping

  • Clean out trash

  • Build Vision Board

  • Add Marin plywood under eves to prevent mosquitos from getting in,

  • Start repair on ceiling in building 1

  • Prep building 1 for mural

  • Caulk outside front of buildings 1-4

  • Fix Pothole on road to camp

  • Install a safe for keys

  • Built tool holders for the workshop

  • Installed motion detectors

  • Painted Murals

  • Replaced so many doors

  • Cleaned out so many rooms

Past Projects at Winners Camp: